Tag Archives: Lindsay Rd

Community Councils Together on Trams/Trams Team meeting, 27 August 2020

Minutes of the Community Councils Together on Trams/Trams Team meeting (Construction Phase) via Google Meet on Thursday 27 August 2020 at 5:30pm Continue reading

Community Councils Together on Trams/Trams Team meeting, 30 July 2020

Minutes of the Community Councils Together on Trams/Trams Team meeting (Construction Phase) via Google Meet on Thursday 30 July 2020 at 5:30pm Continue reading

Community Councils Together on Trams/Trams Team meeting, 25 June 2020

Minutes of the Community Councils Together on Trams/Trams Team meeting
(Construction Phase) via Google Meet on Thursday 25 June 2020 at 5:30pm Continue reading

Community Councils Together on Trams/Trams Team meeting, 28 May 2020

Minutes of the Community Councils Together on Trams/Trams Team meeting (Construction Phase) via Google Meet on Thursday 28 May 2020 at 5:30pm Continue reading

Trams to Newhaven newsletter, 19 June 2020

Unfortunately, the newsletter was not published with a link to a version viewable in a browser. LCCC has replicated the text and links in the newsletter, for the information of its online followers.
Continue reading

Main construction start – Trams to Newhaven

(Copied from an email from Trams to Newhaven)

The main construction works for the Edinburgh’s Trams to Newhaven project will start from Monday 15 June 2020 in line with the Scottish Government’s Phase 2 ‘soft start to site works (only where physical distancing can be maintained).

Work on the project was stopped at the end of March to comply with Government guidance and to protect the safety of workers and residents during the coronavirus outbreak.

Following the First Minister’s announcement on 21 May of a phased return for construction sites, plans have been drawn up in line with Scottish Government safety guidelines and industry best practice to ensure the safety of workers and the public. At the briefing on 28 May the First Minister confirmed that site preparation could begin and, following the announcement today, main construction works can now start. This will encompass the existing sites on Lindsay Road, Melrose Drive and Constitution Street which will start from Monday 15 June. In addition, main construction works on Leith Walk from Elm Row to Crown Place will start on Monday 22 June.

In advance of this some preparatory works on Leith Walk will start on Monday 15 June 2020 ahead of the installation of traffic management which will begin on the evening of Friday 19 June and be operational from 5am on Saturday 20 June 2020 including Lothian Bus diversions. All traffic management arrangements are made in consultation with key partners in the city, including blue light services and public transport providers, through the Traffic Management Review Panel and are continuously monitored and reviewed to ensure they work as effectively as possible.

All works will be carried out through physical distancing and additional measures to protect workers’ health will include daily briefings, continuous on-site inspections and health and safety ‘ambassadors.’ The numbers of workers on-site will be kept to a minimum and a large proportion of the project office staff will continue to work from home. While physical distancing will be a key principle of construction working, workers will also have access to personal protection equipment (PPE) which they may choose to wear as an additional precaution if they wish. It should be noted that it may take time for the sites to become fully operational.

The logistic hubs at the Mitchell Street, Foot of the Walk, Dalmeny Street, Albert Street and Montgomery Street will re-open on Monday 22 June to support local businesses with deliveries and despatches. All communal bins that are currently situated on Leith Walk will be moved to the side streets.

If you have any queries please do not hesitate to get in contact.

Chris Wilson

For information

The Scottish Government’s phased approach to construction details six key phases to ensure work is carried out in a safe way. These are:

  • Phase 0: Planning
  • Phase 1: Covid-19 Pre-start Site preparation
  • Phase 2: ‘Soft start’ to site works (only where physical distancing can be maintained)
  • Phase 3: Steady state operation (only where physical distancing can be maintained)
  • Phase 4: Steady state operation (where physical distancing can be maintained and/or with PPE use)
  • Phase 5: Increasing density/productivity with experience

Trams: shut-down plans overview (27 March)

(from the Trams to Newhaven newsletter dated 27 March)

Construction on Edinburgh’s Trams to Newhaven project will stop this week to protect the safety of workers and residents during the current Coronavirus outbreak.

The Council’s decision to instruct contractors Morrison Utility Services (MUS) and Sacyr Farrans Neopul (SFN) to cease site works follows advice from Scotland’s First Minister that all construction sites should close, unless the project being delivered is essential, such as a hospital.

SFN and MUS will make sites on Leith Walk, Constitution Street, Lindsay Road and Ocean Drive safe and secure by the end of the week before shutting down. There will be contractors on site as necessary for safety and security checks.

Emergency services have access to all sites at all times should they require it.

Work will continue off-site where this can be done remotely,  including design, planning and scheduling, as well as drawing up a remobilisation strategy for returning to the site once restrictions are lifted. The project team will also be closely liaising with MUS and SFN to look at ways of mitigating the impact of work stopping on the wider project.

Community Councils Together on Trams/Trams Team meeting, 27 February 2020

Minutes of the Community Councils Together on Trams/Trams Team meeting (No 2 Construction Phase) at 165 Leith Walk on Thursday 27 February at 5:30pm Continue reading

Proposed Carriageway Resurfacing Works – Summer 2019/20

(adapted from an email from Edinburgh Council)

The carriageway on a number of streets in your Ward are due to be resurfaced during the Summer of 2019. The roads affected have been prioritised because of their current condition and because the upcoming tram works will prevent any planned resurfacing work from taking place in and around the proposed tram line during the construction period.

The resurfacing works are planned to start on 27 May and will be carried out during weekdays in separate phases in order to minimise disruption to the public. On some traffic sensitive routes, work may be carried out under nightshift to minimise the impact on traffic. Most roads affected will be fully or significantly resurfaced with a select few being only partially resurfaced or patched as required. There will also be some improvements to pedestrian facilities, traffic signal upgrades and renewal of some street furniture.

Continue reading