Author Archives: minsec

NHS Information Bulletin 46

This bulletin has potentially very useful information on

  1. Classes, Courses, Workshops, Training, Support and Publications
  2. Events, Fairs, Community Days and Seminars
  3. Health Service / Statutory Agencies / Government – documents and information
  4. Strategies, Consultations, Campaigns and Websites
  5. Organisations, Groups, Networks and Charities – News and Information
  6. Funding Opportunities and Grants
  7. Useful websites and contacts

There is likely to be something for almost everyone!

 

Plans for new Lidl store at 248 Easter Road – update

Lidle have a website about the proposed new store on Easter Road: www.lidleasterroad.co.uk

They can also be contacted at easter.road@lidl.co.uk.

Please see the plans and further information posted earlier here.

Update (11 October 2015)

On 11 September 2015, Lidl submitted a full planning application (15/04194/FUL) which appears to occupy a substantially larger footprint and with more parking/loading and retail space than signalled when Lidl representatives presented to LCCC in 2014 and – apparently – to local residents earlier this year. Objections and comments need to be submitted by 16 October 2015.

Click the graphic to see a full-sized PDF of ‘indicative massing images’.

S:2000-24992400-2449G2436 Lidl ,Easter Road (G1700-99)1 Arc

Leith Walk repairs – LCCC’s position

This paper shows the position Leith Central Community Council adopted on 20 January 2014. The yellow highlights show amendments to the original agreed at the meeting.

The main points are:

LCCC agrees that the highest priority for Leith Walk is the speedy implementation of physical improvement measures, fixing the serious deterioration of the public realm since 2007. In particular, LCCC agrees to pursue implementation of measures with a design life of 7-15 years in the following order of priority:

  1. for Pilrig Street to Picardy Place and Foot of the Walk -­ the most heavily used sections of Leith Walk, implementation of immediate basic pedestrian measures starting at the northern end, reinstating pavements to what was there before tram works/MUDFA disruption ­ same materials, same layout and requiring no immediate new TRO, and using simplified procurement procedures and (some of) the £3.2m budget initially approved in 2011. This initial work should also include routine patching of potholes (from ordinary repair budget) and renewal of yellow lines.
  2. for Crowne Place to Iona Street, approval of present TRO and subsequent speedy implementation ­ despite possible design shortcomings, followed by a review in light of first 12 months experience, in particular the option of locating a number of communal bins in suitable side streets.
  3. using projected remaining funds and coordinated with implementation of recommendation 2a (accepting minor duplication of work), create a more ambitious design for Pilrig Street to Picardy Place and Foot of the Walk that meets the Scottish Government funding criteria and benefits in the first instance local residents, particularly pedestrians, then public transport and cyclists, then retailers and visitors to Leith Walk and finally road users who are passing through.

Leith Central CC draft minutes, 20 January 2013

Here are draft minutes from the meeting of 20 January 2014: 2014_01_20 draft

Topics discussed include:

  • Potential Lidl store at 248 Easter Road
  • Leith Walk repairs – see discussion paper on pages 5-7 of the minutes.

An updated version of the paper on Leith Walk repairs will be in the following post.

Engagement with Edinburgh Council budget

The Community Council Liaison Officer writes

Dear Secretary

Thanks to everyone who  submitted comments as part of the budget engagement.  Please find below the link to the report on the findings from the budget engagement for distribution through your networks.

http://www.edinburgh.gov.uk/download/meetings/id/41920/item_7_7-budget_proposals_2014_15_overview_of_feedback_and_engagement

Eileen